Use Case
Network Services for New Construction or Build-Outs
How cabling, Wi-Fi, and connectivity get designed into a project before move-in, instead of retrofitted afterward once walls and furniture are already in place.
The Problem
Connectivity and network cabling are often treated as something to figure out later in a construction or build-out project, addressed only once walls are closed, ceilings are finished, and furniture has arrived. By that point, what would have been a simple cabling run during construction turns into a disruptive, expensive retrofit.
This happens because network requirements aren’t usually part of the conversation architects, electricians, and general contractors are having early on. Electrical gets planned in detail. Cabling and Wi-Fi coverage often don’t, simply because no one with that expertise was in the room when those decisions were being made.
The cost of this gap shows up later, opening day delayed because connectivity isn’t ready, or a finished space getting cut into to run cable that should have gone in during the original build.
At a Glance
Best fit: Businesses with a construction or office build-out project underway or being planned
Core problem solved: Connectivity treated as an afterthought, leading to costly post-construction retrofits
Underlying technology: Cabling, Wi-Fi, and connectivity design integrated into the construction timeline
Typical trigger: A build-out underway with no network plan yet, or a past project where connectivity was added too late
Time to value: Network design typically needs to begin alongside electrical planning, well before move-in
What Triggers This Conversation
A build-out underway with no network plan
A past project where connectivity was an afterthought
An architect or contractor asking for requirements
A tight opening timeline
Who Owns This Decision
This is usually raised by whoever is managing the construction or build-out project day to day, an operations lead, facilities manager, or sometimes the general contractor themselves, once it becomes clear network planning hasn’t been addressed.
IT or whoever owns the eventual operational connectivity typically needs to be brought in at this point, since they understand what the finished space actually needs to support, even though they may not have been part of the original construction planning.
This is most effective when raised early, ideally alongside electrical planning, but in practice often gets raised partway through a project once someone realizes network requirements were never formally addressed.
When This Isn’t the Right Fit
- Businesses moving into existing, already-cabled space with no construction involved
- Very small spaces where minimal cabling is needed regardless of project timing
- Projects already far enough along that walls and ceilings are closed, where the conversation shifts to retrofit planning rather than design-in
What Success Looks Like
Designed In, Not Retrofitted
Connectivity Ready at Move-In
No Retrofit Costs
How Fidalia Solves This
Fidalia engages early in the construction or build-out timeline, designing cabling, Wi-Fi, and connectivity into the project plan alongside electrical, rather than treating it as a separate concern to be addressed after the fact.
This includes coordinating directly with architects and general contractors so network requirements are reflected in the plans before walls and ceilings close, and aligning the connectivity install, including OnePort where redundancy is part of the design, with the broader construction schedule.
The goal is a space that’s ready to operate on connectivity from day one, not a finished build that still needs network work done after the fact.
Frequently Asked Questions
How early in the project should we bring Fidalia in?
Can Fidalia work directly with our architect and general contractor?
What if construction has already started without a network plan?
Does this include backup internet or just initial cabling and Wi-Fi?
How does this affect the overall construction timeline?
Get Connectivity Designed Into Your Project
Fidalia can review your project timeline and show you how network planning fits alongside your construction schedule.